Commissioning is a package of works performed to prepare installed technological equipment and bring it into operating condition.
Torch factory's equipment is supplied with blocks prepared for commissioning and most frequently the client performs the commissioning works independently. Torch-Air factory's specialists are always willing to provide a detailed consultation on equipment launch.
Work stages:- The breakdown of the work stages.
- Immediate equipment installation for commissioning.
- Launching installed equipment into operating condition.
Responsible for this service on behalf of Torch-Air factory are the chief technology officer, head designer, and the head of maintenance services.
All responsible persons have extensive experience installing and launching equipment. In terms of higher education, many employees have undergone practice in terms of specialized courses and doctoral degrees.
The cost of commissioning is always on a case-by-case basis and depends on the volume of the works to be performed.