Download the questionnaire and submit it to us
info@torch-air.com
Made in the USA
Scan the QR code or click on it to start a chat in WhatsApp
Home / Services / Supervision and Installation

Supervision and Installation of Dust Collection Systems

Our dust collection devices have such a simple design that clients usually install them on their own. It is a good way for an enterprise to save money. SKD assembly is performed based on the instructions, just as if one were assembling furniture. Furthermore, to help save you time, we provide installation team services, as well as installation supervision services.

Our chief technology officer, chief designer, and head of maintenance services are in charge of and monitor the performance of the supervision and installation services. They have extensive experience installing and launching equipment into operation. Many employees have completed specialized courses and doctorates as well.

The cost of these services and the time it takes to carry them out is case-to-case and depends on the work volume. You can get a consultation from our specialists and obtain a detailed calculation right now:

Installation

Included in the installation service is complete or partial assembly and installation of ordered equipment based on designs, projects, and drawings coordinated with Torch factory’s employees in advance.


Project Stages

  1. Provision of the scheme and design of the location arrangement from the client to prepare the dust collection system for installation.
  2. Delivery of the product to the facility.
  3. Designation of the project stages.
  4. On-premises equipment installation.

Installation Supervision

Included within the supervision is full or partial designer supervision of the assembly and
installation of ordered equipment based on designs, projects, and drawings beforehand by the chief designer’s staff and/or department head of Torch's assembly factory. Meanwhile, the installation itself is performed by the client's employees or other company that it may hire to do so.

Project Stages
  1. Provision of the scheme and design of the location arrangement from the client to prepare
  2. the dust collection system for installation.
  3. Delivery of the product to the facility.
  4. Planning of the project stages.
  5. Direct designer supervision of the equipment's installation.
quotation mark
We always make extremely precise calculations and provide assistance in choosing the optimal cleaning systems, which usually takes 1 to 2 days.
Head of Engineering,
Vladimir Nikulin
CALCULATION AND SELECTION
After filling out this form, you will obtain the cost of the equipment and time frame over which it will be delivered
quotation mark
By filling out this form, you agree to our personal data processing policy
DELIVERY AND INSTALLATION ALL OVER USA, CANADA, MEXICO
FULL ADHERENCE TO QUALITY STANDARDS
WE CUSTOMIZE INSTALLATIONS TO SUIT YOUR COMPANY
FAVORABLE PRICES FROM A US MANUFACTURER
Map
Operating in USA, Canada, and Mexico
Black torch