The control panel is mounted on the unit. Three levels of control are available:
During operation, check the liquid level, irrigation flow and, for neutralization duties, the solution pH. Inspect the packing through the viewports for fouling or uneven wetting and clean the droplet eliminator as needed.
Before each move, drain and flush the tank; after transport, check fittings, valves and the panel before the unit is started.